8 Meter Hydraulic Mini Excavator Pile Driver With Vibro Hammer 172 KN

Contact me for free samples and coupons.
Whatsapp:0086 18588475571
Wechat: 0086 18588475571
Skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
xName | MIni Hydraulic Pile Driver | Feature | Suitable For Any Brand Of Small Excavator |
---|---|---|---|
Vibration | 2500 Rpm | Operational Pressure | 30 Mpa |
Centrifugal Force | 172 KN | Max. Pile | 8 M |
Arm | 260 Kg | Hammer | 1100 Kg |
Material | Steel, Core Materials Are All Imported | Condition | New And Used Both Available |
Type | Hydraulic Vibrating Hammer | Color | Blue/Yellow, Customized Color Available |
HS Code | 84301000 | ||
Highlight | Mini Excavator Hydraulic Vibratory Hammer,8 Meter Excavator With Vibro Hammer,172 KN Mini Excavator Vibro Hammer |
Mini Hydraulic Pile Driver
Mini hydraulic pile driver for the company's original products, its birth to fill the industry gap; Changed the history of small excavator can not be refitted pile driver; Solve the problem that small foundation pile can not be mechanized construction.
This series of models for the new rural reconstruction of the basic engineering construction has made an outstanding contribution.
VIBRA vibrating pile hammer is utilizing its high frequency vibration to vibrate pile body with high-speed increase to pass the vertical vibration of mechanical produce to pile which prompting changes in the soil structure around the pile, strength decline. Soil around the piles become liquefaction to lessen frictional opposition between side of the pile and the soil. Then, at that point, utilizing the excavator down power, vibrating pile hammer and pile body weight to sink pile into the soil. When extricating piles, in the state of vibration to take out the pile by utilizing excavator lift power. Excitation power required by pile driving hardware are extensive controlled by site soil, soil condition, dampness content and sort of pile development.
Equipment Advantages
|
|
|
|
|
|
|
Technical Parameter
Item | FV-100 | FV-150 |
Vibration Frequency (rpm) | 2500 | 2800 |
Operation Pressure (Mpa) | 30 | 32 |
Centrifugal Force (KN) | 117 | 172 |
Max.Pile (m) | 6 | 8 |
Arm (kg) | 160 | 260 |
Hammer (kg) | 850 | 1100 |
Excavator (T) | 7-12 | 12-17 |
About Us
Ye Kun Construction Machinery Co., Ltd. is one specialized is engaged in the vibration sinking pile drawing machine equipment production, sale and service of technology-oriented enterprises, products mainly emerging a high-speed hydraulic pile drawing machine and peripheral accessories, equipment widely used in all kinds of foundation engineering construction.
After a short period of development, the company won the recognition of customers, and the annual sales growth doubled. Marketing the country with the VIBRA brand and export it. The company′s production of mini hydraulic pile driver, vibration hammer and other products quality has reached the advanced level of the industry.
FAQ
Q: How long is the warranty period ?
A: The warranty period is 12 months from the date of completion of installation, the mainframe and key components, except for wearing parts.
Q: What is the MOQ ?
A: 1 set is available.
Q: What's the payment method ?
A: We accept T/T and D/P payment.
Q: What is the delivery time ?
A: The delivery time is generally 7-35 days, and arrive at Shanghai Port. Shipping time should be considered overseas.
Q: Can I have our LOGO on the machine ?
A: Of course you can.
Q: How is your product quality ?
A: Our equipment is strictly implemented in accordance with the technical standards of "Technical Conditions for Pile Driver Enterprises".
Q: Can I be your dealer ?
A: Welcome to become our dealer, and we are looking forward to further developing into a regional general agent and strategic partner like you with lofty ideals!
Q: How To Order?
A:
1. Please tell us the model with quantity and other requirement which you needed.
2. We issue the Proforma Invoice to you after confirmed the price and other details.
3. We arrange the order production upon receipt of confirmed PI and your deposit or original L/C.
4. After the goods is ready to ship, we will inform you the shipment date and other informations by email at the same time.
5. We will help to track your goods until you receive them safely.