10M Excavator Mounted Pile Driver In Hard Soil Condition
Contact me for free samples and coupons.
Whatsapp:0086 18588475571
Wechat: 0086 18588475571
Skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
xName | Excavator Mounted Pile Driver | Vibration Frequency | 2800rpm |
---|---|---|---|
Operation Pressure | 32Mpa | Hammer Weight | 1700kg |
Arm Weight | 5000kg | Max.Pile Length | 10m |
Centrifugal Force | 265Kn | Excavator | 20-30 Ton |
Hanging Amplitude | 6mm | Eccentric Moment | 2.5kgm |
Material | Steel, Core Materials Are All Imported | HS Code | 84301000 |
Condition | New And Used Both Available | Color | Blue/Yellow, Customized Color Available |
High Light | 10M Excavator Mounted Pile Driver,Hard Soil Excavator Mounted Pile Driver,32Mpa Excavator Mounted Pile Driver |
Medium and Large Excavator Mounted Hydraulic Vibrating Pile Driver
This series of models have higher requirements for the overall design and manufacturing level. Drawing on the advanced technology of large hydraulic vibration hammer from Europe and America and our years of experience in the industry, we have developed a unique box structure with high reliability and longer average service life of bearings, which is in the leading position in the same industry.
10 ~ 18 meters of sheet pile construction is the mainstream of the market, we provide a variety of eccentric groups for selection, strength optimization for each component, with higher safety and a wide range of adaptability to various geological conditions.
Technical Parameter
Item | FV-250 | FV-280 | FV-300 | FV-330 | FV-350L | FV-350 | FV-400 |
Vibration Frequency (rpm) | 2500 | 2800 | 3200 | 3200 | 3200 | 3200 | 3200 |
Operation Pressure (Mpa) | 30 | 32 | 32 | 32 | 32 | 32 | 32 |
Centrifugal Force (KN) | 265 | 335 | 350 | 372 | 435 | 455 | 485 |
Max.Pile Length (m) | 10 | 12 | 12 | 12 | 15 | 15 | 18 |
Arm Weight (kg) | 500 | 500 | 670 | 670 | 670 | 750 | 750 |
Hammer Weight (kg) | 1700 | 1900 | 2100 | 2300 | 2400 | 2600 | 2700 |
Excavator (T) | 20-30 | 20-30 | 30-35 | 33-40 | 35-40 | 40-45 | 45-60 |
About Us
Ye Kun Construction Machinery is one specialized is engaged in the vibration sinking pile drawing machine equipment production, sale and service of technology-oriented enterprises, products mainly emerging a high-speed hydraulic pile drawing machine and peripheral accessories, equipment widely used in all kinds of foundation engineering construction.
After a short period of development, the company won the recognition of customers, and the annual sales growth doubled. Marketing the country with the VIBRA brand and export it. The company′s production of mini hydraulic pile driver, vibration hammer and other products quality has reached the advanced level of the industry.
The company has a young and enterprising team cooperation, in order to respect the customer value as self value, to become the most reliable, the most comprehensive, the most professional vibration pile machine equipment and service suppliers and make unremitting efforts.
Q: How long is the warranty period ?
A: The warranty period is 12 months from the date of completion of installation, the mainframe and key components, except for wearing parts.
Q: What is the MOQ ?
A: 1 set is available.
Q: What's the payment method ?
A: We accept T/T and D/P payment.
Q: What is the delivery time ?
A: The delivery time is generally 7-35 days, and arrive at Shanghai Port. Shipping time should be considered overseas.
Q: Can I have our LOGO on the machine ?
A: Of course you can.
Q: How is your product quality ?
A: Our equipment is strictly implemented in accordance with the technical standards of "Technical Conditions for Pile Driver Enterprises".
Q: Can I be your dealer ?
A: Welcome to become our dealer, and we are looking forward to further developing into a regional general agent and strategic partner like you with lofty ideals!
Q: How To Order?
A:
1. Please tell us the model with quantity and other requirement which you needed.
2. We issue the Proforma Invoice to you after confirmed the price and other details.
3. We arrange the order production upon receipt of confirmed PI and your deposit or original L/C.
4. After the goods is ready to ship, we will inform you the shipment date and other informations by email at the same time.
5. We will help to track your goods until you receive them safely.