-
Hydraulic Pile Driver
-
Excavator Mounted Pile Driver
-
Electric Vibratory Hammer
-
Side Grip Pile Driver
-
Four Eccentric Pile Driver
-
360 Degree Pile Driver
-
Mini Excavator Pile Driver
-
Concrete Pile Driving Equipment
-
Pile Driver Long Boom
-
Mechanical Boom
-
Pile Driver Parts
-
Bore Drilling Machine
-
Hydraulic Hedge Cutter
-
Hydraulic Trencher
-
Photovoltaic Pile Driver
-
Sheet Pile Driving Machine
-
Hydraulic Impact Hammer
-
Hydraulic Pile Breaker
Professional Pile Driver | 1900KG & Designed for 20-30Ton Excavator Use
Contact me for free samples and coupons.
Whatsapp:0086 18588475571
Wechat: 0086 18588475571
Skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
x| Name | Solar Pile Driving Equipment | Feature | More Efficient And Cheaper |
|---|---|---|---|
| Arm | 500kg | Pressure | 32Mpa |
| Hammer | 1900kg | Vibration | 2800rpm |
| Centrifugal Force | 335KN | Excavator Weight | 20-30T |
| Highlight | solar pile driving equipment,hydraulic pile driving hammer |
||
The YEKUN Solar Pile Driver is a specialized foundation machine engineered specifically for photovoltaic construction projects. Designed to handle solar pile installation and extraction efficiently, it overcomes traditional limitations of small vibration force and low efficiency. With models like FV-280 and FV-350S tailored for China's growing solar industry, this pile driver delivers maximum performance for light-to-medium capacity excavators, providing a unique and integrated solution for solar farm development.
- Solar-Specific Design: Uniquely engineered for photovoltaic pile installation and extraction, offering both driving and pulling functions.
- High-Vibration Efficiency: Provides strong vibration force in a compact design, overcoming traditional piling limitations.
- Premium International Components: Equipped with high-quality hydraulic motors, German FAG bearings, and other imported core parts.
- Compact & Lightweight: Portable structure allows easy transportation and flexible operation on solar farm sites.
- Optimized Excavator Integration: Specifically matched to light-capacity excavators for maximum performance in photovoltaic construction.
- Industry-Leading Solution: As the sole specialized manufacturer for the photovoltaic sector, we offer unmatched expertise and tailored equipment.
- Enhanced Productivity: Delivers superior performance compared to traditional piling rigs, accelerating solar project timelines.
- Cost-Effective Operation: Maximizes excavator efficiency while minimizing fuel consumption and operational costs.
- Reliable Performance: Built with international-grade components ensuring durability and consistent operation.
- Versatile Functionality: Capable of both driving and extracting solar piles, providing complete foundation solutions.
| Model | FV-250 | FV-280 | FV-300 | FV-330 | FV-350S | FV-350 | FV-400 |
|---|---|---|---|---|---|---|---|
| Vibration Frequency (rpm) | 2500 | 2800 | 3200 | 3200 | 3200 | 3200 | 3200 |
| Centrifugal Force (kN) | 265 | 335 | 350 | 372 | 435 | 455 | 485 |
| Max. Pile Length (m) | 10 | 12 | 12 | 12 | 15 | 15 | 18 |
| Excavator Compatibility (T) | 20-30 | 20-30 | 30-35 | 33-40 | 35-40 | 40-45 | 45-60 |
A: It is uniquely designed for photovoltaic pile installation with optimized vibration force and excavator compatibility for solar farm construction.
A: Yes, we are proud to be the sole manufacturer providing dedicated pile driving solutions for the photovoltaic industry.
A: Our machines feature imported hydraulic motors, German FAG bearings, and other international-grade core components.
A: Yes, this versatile machine handles both solar pile installation and extraction efficiently.
A: Models are available for excavators ranging from 20 to 60 tons, with specific optimization for light-capacity machines.
A: Standard delivery to Shanghai Port typically takes 1-8 days, plus international shipping time.
A: Yes, we offer logo customization and can tailor solutions based on specific project requirements.
A: We welcome partnerships with dealers and distributors interested in the renewable energy construction sector.

