18 Meter Hydraulic Vibrating Pile Driver For 45 To 60 Ton Excavator

Place of Origin Shanghai, China
Brand Name VIBRA
Certification ISO 9001:2015
Model Number FV-400
Minimum Order Quantity 1 set
Price 20000 to 32000 USD
Packaging Details 7.6 CBM
Delivery Time 7-35 days
Payment Terms T/T, D/P, Western Union, MoneyGram, L/C, D/A
Supply Ability 15 set/month

Contact me for free samples and coupons.

Whatsapp:0086 18588475571

Wechat: 0086 18588475571

Skype: sales10@aixton.com

If you have any concern, we provide 24-hour online help.

x
Product Details
Name Hydraulic Impact Hammer Pile Driver Feature High Precision
Operation Pressure 32Mpa Arm Weight 750kg
Hammer Weight 2700kg Vibration Frequency 3200rpm
Centrifugal Force 485 Kn Maximum Piling Depth 18 Meter
Color Blue/Yellow/Red/White, Customized Color Available Material Steel, Core Materials Are All Imported
HS Code 8430100000 Type Hydraulic Vibrating Hammer
High Light

45T Hydraulic Vibrating Pile Driver

,

18 Meter Hydraulic Vibrating Pile Driver

Leave a Message
Product Description

18 meter hydraulic vibrating pile driver for 45 to 60 ton excavator

 

VIBRA FV-400 was installed on 60-ton Doosan DX600 excavator with the aim of fulling customer requirements of driving till 18-meter sheet piles in high storage building construction projects. Customers first use it to drive till 12 meter sheet piles to see how it performs, while the STP value was relatively low, helps the sheet pile to drive into the ground quite easily. The construction site has some where STP value was relatively high, later VIBRA FV400 able to drive those places as perfectly as performed in other areas. FV400 pile driver with efficient, flexible use, set up a faster working environment at the construction site, not only greatly reduce the cost of the project, but also produce aggregate profit!

 

Features

 

VIBRA hydraulic vibratory hammer is the vibratory driving piling equipment which is popular among a wide variety of foundation projects.Apart from driving and pulling elements such as sheet piles and pipes, vibratory hammers are also used for soil densifying or vertical drainage, especially suitable for municipal , bridges, cofferdam, building foundation, etc.

With advanced technology, vibratory hammer has advantages of low noise, high efficiency, non-pollution and non-damage to piles,etc.

 

Technical Parameters

 

Item FV-250 FV-280 FV-300 FV-330 FV-350L FV-350 FV-400
Vibration Frequency (rpm) 2500 2800 3200 3200 3200 3200 3200
Operation Pressure (Mpa) 30 32 32 32 32 32 32
Centrifugal Force (KN) 265 335 350 372 435 455 485
Max.Pile Length (m) 10 12 12 12 15 15 18
Arm Weight (kg) 500 500 670 670 670 750 750
Hammer Weight (kg) 1700 1900 2100 2300 2400 2600 2700
Excavator (T) 20-30 20-30 30-35 33-40 35-40 40-45 45-60

 

Working Principle

 

Hydraulic vibrating pile driver take the advantage of high frequency vibration generated by motor and transit the vibration force to the hydraulic vibrating pile driver for the surrounding soil liquefying & break its structure to reduce the friction; then piling or drilling the pile form the soil ground via excavator. The high frequency vibration is driven by the hydraulic motor of the excavator.

The hydraulic motor drives the two eccentric axes to rotate at high speed in opposite direction. The horizontal force of the eccentric axis cancels each other without vibration. The vertical forces add up to each other, creating a vertical-frequency vibration.

 

18 Meter Hydraulic Vibrating Pile Driver For 45 To 60 Ton Excavator 0

 

18 Meter Hydraulic Vibrating Pile Driver For 45 To 60 Ton Excavator 1

FAQ

 

Q: Are you a manufacturer?

 

A: Yes, we have been in this field for more than 12 years, our factory is in Suzhou and you are welcome to visit our unit anytime during working hour period,

 

Q: Who is your main customer?

 

A: Our customers are spreading all over the China with some abroad countries as well namely from New Zealand, Malaysia, Indonesia and many more are joining in the list. Brands like XCMG, SANY, Zoomlion, Caterpillar and Hyundai are our valuable customers.

 

Q: How long is the warranty period ?

 

A: The warranty period is 12 months from the date of completion of installation, the mainframe and key components, except for wearing parts.

 

Q: What is the MOQ ?

 

A: 1 set is available.

 

Q: What's the payment method ?

 

A: We accept T/T and D/P payment.

 

Q: What is the delivery time ?

 

A: The delivery time is generally 7-35 days, and arrive at Shanghai Port. Shipping time should be considered overseas.

 

Q: Can I have our LOGO on the machine ?

 

A: Of course you can.

 

Q: How is your product quality ?

 

A: Our equipment is strictly implemented in accordance with the technical standards of "Technical Conditions for Pile Driver Enterprises".

 

Q: Can I be your dealer ?

 

A: Welcome to become our dealer, and we are looking forward to further developing into a regional general agent and strategic partner like you with lofty ideals!