3500 RPM Vibro Hammer With 385 Centrifugal Force Hard Soil Ensure Piling

Place of Origin Shanghai, China
Brand Name VIBRA
Certification ISO 9001:2015
Model Number PCF-300
Minimum Order Quantity 1 set
Price 15000 to 40000 USD
Packaging Details 5.5 CBM
Delivery Time 7-35 days
Payment Terms L/C, T/T, D/P, Western Union, MoneyGram
Supply Ability 10 Set/Month

Contact me for free samples and coupons.

Whatsapp:0086 18588475571

Wechat: 0086 18588475571

Skype: sales10@aixton.com

If you have any concern, we provide 24-hour online help.

x
Product Details
Name Hydraulic Pile Driving Equipment Feature Stable Running
Operation Pressure 32 Mpa Arm Weight 750 Kg
Hammer Weight 2750 Kg Vibration Frequency 3500 Rpm
Centrifugal Force 385 Kn Excavator 27~30 Ton
Maximum Piling Depth 12 Meter Color Blue/Yellow, Customized Color Available
Material Steel, Core Materials Are All Imported Type Hydraulic Vibrating Hammer
Condition New And Used Both Available HS Code 8430100000
High Light

Hydraulic Pile Driver 3500 RPM

,

Hard Soil Vibro Hydraulic Pile Driver

Leave a Message
Product Description

3500 RPM vibro hammer with 385 centrifugal force ensure piling in hard soil

 

Description

 

VIBRA vibrating pile hammer is utilizing its high frequency vibration to vibrate pile body with high-speed increase to pass the vertical vibration of mechanical produce to pile which prompting changes in the soil structure around the pile, strength decline. Soil around the piles become liquefaction to lessen frictional opposition between side of the pile and the soil. Then, at that point, utilizing the excavator down power, vibrating pile hammer and pile body weight to sink pile into the soil. When extricating piles, in the state of vibration to take out the pile by utilizing excavator lift power. Excitation power required by pile driving hardware are extensive controlled by site soil, soil condition, dampness content and sort of pile development.

 

Features

 

VIBRA hydraulic vibratory hammer is the vibratory driving piling equipment which is popular among a wide variety of foundation projects.Apart from driving and pulling elements such as sheet piles and pipes, vibratory hammers are also used for soil densifying or vertical drainage, especially suitable for municipal, bridges, cofferdam, building foundation, etc.

With advanced technology, vibratory hammer has advantages of low noise, high efficiency, non-pollution and non-damage to piles,etc.

 

Technical Parameter

 

                     Item                    Model PCF-300 PCF-330 PCF-350 PCF-450 PCF-500
Vibration Frequency rpm 3500 3300 3500 3300 3200
Operation Pressure Mpa 32 32 32 32 32
Centrifugal Force kn 385 420 470 535 585
Max. Pile Length m 12 12 15 18 21
Arm Weight kg 750 750 750 820 820
Hammer Weight kg 2750 2850 2950 3150 3350
Excavator T 27~30 33~38 40~45 47~55 55~70


3500 RPM Vibro Hammer With 385 Centrifugal Force Hard Soil Ensure Piling 0

 

Working Principle

 

Hydraulic vibrating pile driver take the advantage of high frequency vibration generated by motor and transit the vibration force to the hydraulic vibrating pile driver for the surrounding soil liquefying & break its structure to reduce the friction; then piling or drilling the pile form the soil ground via excavator. The high frequency vibration is driven by the hydraulic motor of the excavator.

The hydraulic motor drives the two eccentric axes to rotate at high speed in opposite direction. The horizontal force of the eccentric axis cancels each other without vibration. The vertical forces add up to each other, creating a vertical-frequency vibration.

 

Machinery Characteristics

  • The control system adopts integrated import control valve, each action can be controlled independently, convenient for maintenance and check.
  • The vibration frequency is controlled at two stages, and the second stage vibration is the confluence of double pumps, which greatly increases the excitation force and overcomes the special geology.
  • Mini and light weight design make application flexible.
  • Taking the advantage of the excavator hydraulic system without other driving system requirement, which save fuel oil and transportation cost.
  • The operation is simple and easy to learn. The driver who has the operation foundation of excavator can operate it with practice

 

About Us

 

Shanghai Yekun Construction Machinery Co., Ltd. was founded in 2014, A professional company involving in hydraulic vibrating pile driver manufacture, sale and service. Our company take the latest high speed hydraulic vibrating pile driver and its components as the main products. Our products vastly apply for infrastructure & construction industries.

 

We focus on product quality with the latest industrial technology. The mini hydraulic vibrating pile driver lead the industrial trend. The middle and large hydraulic vibrating pile driver also are highly recognized by our clients. At the same time, we actively cooperated with the engineering machinery factory and construction company to jointly develop more functional professional equipment, and we hired foreign professionals as our technical adviser.

 

Our company is consisting of a young, enthusiasm professional team. Adhere to client as priority, Quality as first concern, Management as foundation. We are working for the direction to become the most professional and comprehensive hydraulic vibrating pile driver manufacture and service supplier.

 

 

3500 RPM Vibro Hammer With 385 Centrifugal Force Hard Soil Ensure Piling 1

 

FAQ

 

Q: Are you a manufacturer?

 

A: Yes, we have been in this field for more than 12 years, our factory is in Suzhou and you are welcome to visit our unit anytime during working hour period,

 

Q: Who is your main customer?

 

A: Our customers are spreading all over the China with some abroad countries as well namely from New Zealand, Malaysia, Indonesia and many more are joining in the list. Brands like XCMG, SANY, Zoomlion, Caterpillar and Hyundai are our valuable customers.

 

Q: How long is the warranty period ?

 

A: The warranty period is 12 months from the date of completion of installation, the mainframe and key components, except for wearing parts.

 

Q: What is the MOQ ?

 

A: 1 set is available.

 

Q: What's the payment method ?

 

A: We accept T/T and D/P payment.

 

Q: What is the delivery time ?

 

A: The delivery time is generally 7-35 days, and arrive at Shanghai Port. Shipping time should be considered overseas.

 

Q: Can I have our LOGO on the machine ?

 

A: Of course you can.

 

Q: How is your product quality ?

 

A: Our equipment is strictly implemented in accordance with the technical standards of "Technical Conditions for Pile Driver Enterprises".

 

Q: Can I be your dealer ?

 

A: Welcome to become our dealer, and we are looking forward to further developing into a regional general agent and strategic partner like you with lofty ideals!

 

Q: How to order?

 

A:
1. Please tell us the model with quantity and other requirement which you needed.
2. We issue the Proforma Invoice to you after confirmed the price and other details.
3. We arrange the order production upon receipt of confirmed PI and your deposit or original L/C.
4. After the goods is ready to ship, we will inform you the shipment date and other informations by email at the same time.
5. We will help to track your goods until you receive them safely.