Multifunctional 32Mpa Accurate Concrete Pile Driving Equipment

Place of Origin SHANGHAI
Brand Name VIBRA
Model Number FV-250
Minimum Order Quantity 1 set
Price 17000 to 25000 USD
Packaging Details 4.05 CBM
Delivery Time 7-35 days
Payment Terms L/C, T/T, D/P
Supply Ability 15 Set/Month

Contact me for free samples and coupons.

Whatsapp:0086 18588475571

Wechat: 0086 18588475571

Skype: sales10@aixton.com

If you have any concern, we provide 24-hour online help.

x
Product Details
Name Concrete Pile Driving Equipment Feature Multiple Function Including Solar Panel Project
Vibration Frequency 2800rpm Operation Pressure 32Mpa
Centrifugal Force 265KN Max.Pile Length 10m
Arm Weight 500kg Hammer Weight 1700kg
Excavator 20-30 Ton Color Blue/Yellow, Customized Color Available
High Light

32Mpa Concrete Pile Driving Equipment

,

10m solar panel pile driver

,

multifunctional pile driving equipment

Leave a Message
Product Description

Description

 

This series of models have higher requirements for the overall design and manufacturing level. Drawing on the advanced technology of large hydraulic vibration hammer from Europe and America and our years of experience in the industry, we have developed a unique box structure with high reliability and longer average service life of bearings, which is in the leading position in the same industry.

 

10 ~ 18 meters of sheet pile construction is the mainstream of the market, we provide a variety of eccentric groups for selection, strength optimization for each component, with higher safety and a wide range of adaptability to various geological conditions.

Advantages

  • Powerful and multiple function: Applied to various types of steel sheet piles, steel casing piles, vibro driven cast-in-place piles, surface compaction, deep compaction and cast-in-place thin-walled pile construction; also be used as PHC pile , steel sheet pile and steel casing.
  • Fast construction speed, wide range of working geology, and widely used in many fields of engineering construction at home and abroad.
  • Application range: widely used in municipal, water conservancy, construction, bridge, wharf, marine engineering and other pile foundation construction.
  • Permanent projects: wharf, water conservancy dike revetment, retaining wall, retaining wall, breakwater, diversion dike, dock, gate; offshore pile foundation construction, road and bridge engineering, civil construction, municipal engineering, water conservancy engineering, etc.
  • Temporary projects: Mountain sealing, temporary bank expansion, cut-off, bridge and cofferdam construction, earth retaining, water retaining and sand retaining for excavation of temporary ditches for large-scale pipeline laying; it can also be used for flood control, collapse prevention and quicksand prevention.

Multifunctional 32Mpa Accurate Concrete Pile Driving Equipment 0

 

Technical Parameter

 

Item FV-250 FV-280 FV-300 FV-330 FV-350L FV-350 FV-400
Vibration Frequency (rpm) 2500 2800 3200 3200 3200 3200 3200
Operation Pressure (Mpa) 30 32 32 32 32 32 32
Centrifugal Force (KN) 265 335 350 372 435 455 485
Max.Pile Length (m) 10 12 12 12 15 15 18
Arm Weight (kg) 500 500 670 670 670 750 750
Hammer Weight (kg) 1700 1900 2100 2300 2400 2600 2700
Excavator (T) 20-30 20-30 30-35 33-40 35-40 40-45 45-60

 

About Us

 

Shanghai Yekun Construction Machinery Co., Ltd. was founded in 2014, A professional company involving in hydraulic vibrating pile driver manufacture, sale and service. Our company take the latest high speed hydraulic vibrating pile driver and its components as the main products. Our products vastly apply for infrastructure & construction industries.

 

We focus on product quality with the latest industrial technology. The mini hydraulic vibrating pile driver lead the industrial trend. The middle and large hydraulic vibrating pile driver also are highly recognized by our clients. At the same time, we actively cooperated with the engineering machinery factory and construction company to jointly develop more functional professional equipment, and we hired foreign professionals as our technical adviser.

 

 

Multifunctional 32Mpa Accurate Concrete Pile Driving Equipment 1

 

FAQ

 

Q: How long is the warranty period ?

 

A: The warranty period is 12 months from the date of completion of installation, the mainframe and key components, except for wearing parts.

 

Q: What is the MOQ ?

 

A: 1 set is available.

 

Q: What's the payment method ?

 

A: We accept T/T and D/P payment.

 

Q: What is the delivery time ?

 

A: The delivery time is generally 7-35 days, and arrive at Shanghai Port. Shipping time should be considered overseas.

 

Q: Can I have our LOGO on the machine ?

 

A: Of course you can.

 

Q: How is your product quality ?

 

A: Our equipment is strictly implemented in accordance with the technical standards of "Technical Conditions for Pile Driver Enterprises".

 

Q: Can I be your dealer ?

 

A: Welcome to become our dealer, and we are looking forward to further developing into a regional general agent and strategic partner like you with lofty ideals!