Hydraulic Pile Driver
-
Excavator Mounted Pile Driver
-
Electric Vibratory Hammer
-
Side Grip Pile Driver
-
Four Eccentric Pile Driver
-
360 Degree Pile Driver
-
Mini Excavator Pile Driver
-
Concrete Pile Driving Equipment
-
Pile Driver Long Boom
-
Mechanical Boom
-
Pile Driver Parts
-
Bore Drilling Machine
-
Hydraulic Hedge Cutter
-
Hydraulic Trencher
-
Photovoltaic Pile Driver
-
Sheet Pile Driving Machine
-
Hydraulic Impact Hammer
-
Hydraulic Pile Breaker
SV200 Hydraulic Side Grip Pile Driver for Excavators 20-25 Ton
| Eccentric Moment | 4.6 Kgm | Centrifugal Force | 459 Kn |
|---|---|---|---|
| Frequency | 2300~3000 Rpm | Side Clamp Force | 335 Kn |
| Bottom Clamp Force | 385 Kn | Applicable Excarator Class | 20~25 |
| Highlight | 20-25 ton hydraulic pile driver,excavator side grip pile driver,SV200 pile driver with warranty |
||
The SV200 Side Grip Pile Driver represents the pinnacle of efficiency for foundation construction in restricted environments. As a specialized form of hydraulic vibratory hammer, this model is engineered to transform a standard 20-25 ton excavator into a high-performance piling rig. Designed specifically to overcome the challenges of low clearance and confined spaces common in infrastructure projects, the SV200 integrates bidirectional side tilt and 360-degree continuous rotation to deliver unparalleled versatility. Whether you are driving steel sheet piles, H-beams, or pipe piles, this unit offers a seamless, one-machine solution for clamping, positioning, driving, and extraction.
The defining characteristic of the SV200 is its dual-clamp system. It utilizes both a Side Clamp and a Bottom Clamp to secure piles firmly, allowing for precise manipulation even when overhead space is limited. This design eliminates the need for auxiliary cranes or leaders, drastically reducing equipment logistics on site. The robust fixture system features a replaceable standard clamp seat interface, allowing operators to switch between different pile types quickly. Furthermore, its direct mounting compatibility with standard excavators (20-25 ton class) ensures that modification and installation are minimal, reducing downtime and capital expenditure.
- Low Clearance Operation: Perfect for indoor factory renovations, bridge underpasses, and tunnel construction where traditional rigs cannot operate.
- 360° Continuous Rotation: Provides absolute freedom to position piles at any angle without moving the excavator base, enhancing safety and speed.
- High Clamping Force: With a side clamp force of 335 kN and a bottom clamp force of 385 kN, the SV200 ensures a firm grip on heavy materials, preventing slippage during high-frequency vibration.
- Versatility: Handles Steel Sheet Piles, H-Shaped Steel, and Circular Pipe Piles with equal efficiency, making it a multi-purpose investment for contractors.
- Excavator Integration: Utilizes the host machine's existing hydraulic system, simplifying maintenance and operation.
- Unit Weight (Incl. Connector & Clamp): 2280 kg
- Eccentric Moment: 4.6 kgm
- Centrifugal Force: 310 kN
- Frequency Range: 2300-3000 rpm
- Side Clamp Force: 335 kN
- Bottom Clamp Force: 385 kN
- System Operating Pressure: 32 Mpa
- System Operating Flow: 170-230 L/min
- Rotation / Tilt Angle: 360° / ±30°
- Dimensions (LxWxH): 1220 x 1260 x 2150 mm
- Applicable Excavator: 20-25 Ton
This model is ideally suited for the rapidly growing infrastructure sectors of Southeast Asia, India, and Russia. In东南亚 (Southeast Asia), the compact size is perfect for urban infrastructure and riverine projects. In India, it excels in railway and bridge construction where space is often restricted. For the Russian market, the robust hydraulic system and powerful vibration are well-suited for varied geological conditions, including frozen ground and dense soils.
Q1: Can the SV200 be installed on any excavator?
A1: Yes, the SV200 is designed for easy modification on standard 20-25 ton excavators. The connection bracket is adaptable, making installation straightforward and quick.
Q2: What types of piles can this machine handle?
A2: Thanks to its multi-function fixture system and replaceable clamp interfaces, the SV200 can handle steel sheet piles, H-beams, and circular pipe piles.
Q3: Does it require additional equipment to extract piles?
A3: No. The SV200 is a fully independent unit. The same clamping mechanism used for driving is also used for extraction, allowing the excavator operator to pull piles without any additional machinery.
Q4: How does the rotation function help in low clearance areas?
A4: The 360-degree rotation allows the operator to align the pile perfectly with the guide frame or previous piles without repositioning the excavator. This is critical in low headroom where swinging the boom is restricted.