Roads Highway Construction Projects Pile Driver 18 Meter

Place of Origin SHANGHAI
Brand Name VIBRA
Certification ISO 9001:2015
Model Number FV-400
Minimum Order Quantity 1 set
Price 26000 to 32000 USD
Packaging Details 7.6 CBM
Delivery Time 7-35 days
Payment Terms L/C, T/T, D/P
Supply Ability 35 set/month

Contact me for free samples and coupons.

Whatsapp:0086 18588475571

Wechat: 0086 18588475571

Skype: sales10@aixton.com

If you have any concern, we provide 24-hour online help.

x
Product Details
Name Excavator Mounted Pile Driver Feature Low Noise Fast Operation
Vibration Frequency 3200rpm Operation Pressure 32Mpa
Hammer Weight 2700kg Arm Weight 750kg
Max.Pile Length 18m Centrifugal Force 485 Kn
Excavator 45~60 Ton HS Code 8430100000
Material Steel, Core Materials Are All Imported Type New And Used Both Available
Color Blue/Yellow, Customized Color Available
High Light

18 meter Construction Pile Driver

,

Highway Construction Projects Pile Driver

,

32Mpa sheet piling hammer

Leave a Message
Product Description

Description

 

This series of models have higher requirements for the overall design and manufacturing level. Drawing on the advanced technology of large hydraulic vibration hammer from Europe and America and our years of experience in the industry, we have developed a unique box structure with high reliability and longer average service life of bearings, which is in the leading position in the same industry.

 

10 ~ 18 meters of sheet pile construction is the mainstream of the market, we provide a variety of eccentric groups for selection, strength optimization for each component, with higher safety and a wide range of adaptability to various geological conditions.

 

Our Pile Driver is great for Landscaping, Forestry and Building sectors

 

Piling wooden/cement poles for fences

Pile driving for photovoltaic systems

Piling wooden/cement poles for containment of land

Pile driving for building barriers

Pile driving in agriculture

 

Features

 

VIBRA hydraulic vibratory hammer is the vibratory driving piling equipment which is popular among a wide variety of foundation projects.Apart from driving and pulling elements such as sheet piles and pipes, vibratory hammers are also used for soil densifying or vertical drainage, especially suitable for municipal, bridges, cofferdam, building foundation, etc.

With advanced technology, vibratory hammer has advantages of low noise, high efficiency, non-pollution and non-damage to piles,etc.

 

  • Roads Highway Construction Projects Pile Driver 18 Meter 0

 

Technical Parameter

 

Item FV-250 FV-280 FV-300 FV-330 FV-350L FV-350 FV-400
Vibration Frequency (rpm) 2500 2800 3200 3200 3200 3200 3200
Operation Pressure  (Mpa) 30 32 32 32 32 32 32
Centrifugal Force   (KN) 265 335 350 372 435 455 485
Max.Pile Length  (m) 10 12 12 12 15 15 18
Arm Weight  (kg) 500 500 670 670 670 750 750
Hammer Weight  (kg) 1700 1900 2100 2300 2400 2600 2700
Excavator  (T) 20-30 20-30 30-35 33-40 35-40 40-45 45-60

 

Roads Highway Construction Projects Pile Driver 18 Meter 1

 

About Us

 

YeKun Construction Machinery is one specialized is engaged in the vibration sinking pile drawing machine equipment production, sale and service of technology-oriented enterprises, products mainly emerging a high-speed hydraulic pile drawing machine and peripheral accessories, equipment widely used in all kinds of foundation engineering construction.

 

After a short period of development, the company won the recognition of customers, and the annual sales growth doubled. Marketing the country with the VIBRA brand and export it. The company′s production of mini hydraulic pile driver, vibration hammer and other products quality has reached the advanced level of the industry.

 

The company has a young and enterprising team cooperation, in order to respect the customer value as self value, to become the most reliable, the most comprehensive, the most professional vibration pile machine equipment and service suppliers and make unremitting efforts.

 

Roads Highway Construction Projects Pile Driver 18 Meter 2

 

Roads Highway Construction Projects Pile Driver 18 Meter 3

 

FAQ

 

Q: How long is the warranty period ?

A: The warranty period is 12 months from the date of completion of installation, the mainframe and key components, except for wearing parts.

 

Q: What is the MOQ ?

A: One set is available.

 

Q: What's the payment method ?

A: We accept L/C, T/T and D/P payment.

 

Q: What is the delivery time ?

A: The delivery time is generally 7-35 days, and arrive at Shanghai Port. Shipping time should be considered overseas.

 

Q: Can I have our LOGO on the machine ?

A: Of course you can.

 

Q: How is your product quality ?

A: Our equipment is strictly implemented in accordance with the technical standards of "Technical Conditions for Pile Driver Enterprises".

 

Q: Can I be your dealer ?

A: Welcome to become our dealer, and we are looking forward to further developing into a regional general agent and strategic partner like you with lofty ideals!