-
Hydraulic Pile Driver
-
Excavator Mounted Pile Driver
-
Electric Vibratory Hammer
-
Side Grip Pile Driver
-
Four Eccentric Pile Driver
-
360 Degree Pile Driver
-
Mini Excavator Pile Driver
-
Concrete Pile Driving Equipment
-
Pile Driver Long Boom
-
Mechanical Boom
-
Pile Driver Parts
-
Bore Drilling Machine
-
Hydraulic Hedge Cutter
-
Hydraulic Trencher
-
Photovoltaic Pile Driver
-
Sheet Pile Driving Machine
-
Hydraulic Impact Hammer
-
Hydraulic Pile Breaker
15m/Min High-Efficiency Pile Driver – Hydraulic Impact & Rubber Sheath for Guardrail
Contact me for free samples and coupons.
Whatsapp:0086 18588475571
Wechat: 0086 18588475571
Skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
x| Name | Excavator Mounted Hydraulic Pile Driver | Feature | High Speed |
|---|---|---|---|
| Vibration | 3200rpm | Pressure | 32Mpa |
| Hammer | 2600kg | Arm | 750kg |
| Max.Pile Length | 15m | Centrifugal Force | 455kn |
| Excavator Weight | 40~45 Ton | ||
| Highlight | highway guardrail pile driver,15m hydraulic pile hammer,hydraulic guardrail pile driver |
||
Shanghai Yekun Machinery Co., Ltd., founded in 2014, is a professional manufacturer specializing in the R&D, production, sale, and service of hydraulic vibrating pile drivers. Our core products are high-speed hydraulic vibrating pile drivers and their components, widely applied in global infrastructure and construction projects. Designed with user convenience in mind, our pile drivers feature easy dismantling, transportation, and maintenance, while offering strong compatibility and versatile performance for diverse piling needs.
- Multi-Pile Compatibility: Drives and extracts steel sheet piles, concrete piles, steel rail piles, iron plates, H-beams, and other common pile types.
- Flexible Operation: 180° positive/negative rotation for precise pile clamping/lowering; two-level adjustable vibration frequency and variable pump control to meet different project requirements.
- Low Noise & Vibration: Equipped with rubber sheaths to reduce noise and vibration, ensuring quiet operation, short working cycles, and compliance with environmental standards.
- Structure & Pile Protection: Avoids damage to pile tops/bottoms (steel pipe, sheet, rail piles) and nearby buildings, even during frequent close-range operation.
- Rapid Conversion: Enables quick switching between different working modes, adapting to various job sites and construction scenarios.
- Easy Dismantling & Transportation: Optimized structural design with detachable parts and unique long/short boat connection layout, facilitating hassle-free transport and on-site assembly.
- Simplified Maintenance: User-friendly component layout reduces maintenance time and costs, enhancing operational efficiency.
- Energy-Efficient Pile Pulling: Requires less power compared to other piling systems, lowering energy consumption and operational costs.
- High Power-to-Weight Ratio: Compact, lightweight hydraulic motors deliver high power and speed for efficient piling performance.
- Wide Excavator Compatibility: Works with any brand of excavator (20-60 tons), ensuring seamless integration with existing equipment.
- Advanced Technology: Leads the industry with mini hydraulic vibrating pile drivers; medium and large models are highly recognized by global clients. Backed by foreign technical advisors and collaborations with engineering machinery factories for innovative, functional designs.
| Item Model | Vibration Frequency (rpm) | Operation Pressure (Mpa) | Centrifugal Force (KN) | Max. Pile Length (m) | Arm Weight (kg) | Hammer Weight (kg) | Matching Excavator (T) |
|---|---|---|---|---|---|---|---|
| FV-250 | 2500 | 30 | 265 | 10 | 500 | 1700 | 20-30 |
| FV-280 | 2800 | 32 | 335 | 12 | 500 | 1900 | 20-30 |
| FV-300 | 3200 | 32 | 350 | 12 | 670 | 2100 | 30-35 |
| FV-330 | 3200 | 32 | 372 | 12 | 670 | 2300 | 33-40 |
| FV-350S | 3200 | 32 | 435 | 15 | 670 | 2400 | 35-40 |
| FV-350 | 3200 | 32 | 455 | 15 | 750 | 2600 | 40-45 |
| FV-400 | 3200 | 32 | 485 | 18 | 750 | 2700 | 45-60 |
A: We offer a 12-month warranty from the date of installation completion, covering the mainframe and key components (excluding wearing parts).
A: The MOQ is 1 set, supporting small-batch purchases for trial or project-specific needs.
A: We support T/T (Telegraphic Transfer)
A: The production lead time is generally 7-35 days, with delivery to Shanghai Port. Overseas customers should account for additional shipping time.
A: Yes, we provide logo customization services to support your brand promotion.
A: All our pile drivers are strictly manufactured and tested in accordance with the "Technical Conditions for Pile Driver Enterprises" to guarantee reliable performance.
A: We warmly welcome global partners to become our dealers. We also look forward to collaborating with ambitious partners to develop into regional general agents and strategic partners for long-term mutual success.
For more details about our pile driver series or customized solutions, contact Shanghai Yekun Machinery Co., Ltd. today. We are committed to delivering professional, high-quality products and services for your construction projects!

