Project Name: Fishery and PV Complementary Project
Project location: Jiangyan, Taizhou
Model selection: XCMG 300GP VIBRA FV-280
Project Description:
Taizhou, Jiangsu - April 2024 - The XCMG 300GP pile driving rig, equipped with VIBRA's FV-280 hydraulic hammer, has successfully executed floating solar pile installation in Jiangyan District, Taizhou.
Key Project Highlights:
High-Performance Piling: The FV-280 hammer's 335KN excitation force enabled fast, precise pile driving
Challenges Overcome: Optimized solution for limited site access and difficult pile positioning
Efficiency Gains: Significant time and cost savings compared to conventional methods
This project demonstrates VIBRA's capability to deliver reliable, high-efficiency piling solutions for renewable energy infrastructure.