Construction Bridge Engineering Excavator Concrete Pile Driving Equipment

Contact me for free samples and coupons.
Whatsapp:0086 18588475571
Wechat: 0086 18588475571
Skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
xName | Hydraulic Vibrating Sheet Pile Driver | Feature | Mini Pile Driver Suitable For Small Excavator |
---|---|---|---|
Use | Construction Work Related To Piling | Brand | VIBRA |
Material | Core Materials Are All Imported | Color | Blue/Yellow, Customized Color Available |
Hammer Weight | 1100 Kg | Arm | 260 Kg |
Max Piling | 8 Meter | ||
Highlight | excavator Concrete Pile Driving Equipment,Construction Concrete Pile Driving Equipment,bridge engineering pile driver |
Description
Regardless of the application, our experienced team can help select the right pile driving equipment for your particular job.
Mini hydraulic pile driver for the company's original products, its birth to fill the industry gap; Changed the history of small excavator can not be refitted pile driver; Solve the problem that small foundation pile can not be mechanized construction.
This series of models for the new rural reconstruction of the basic engineering construction has made an outstanding contribution.
Features
- Main application fields of hydraulic vibration hammer at present: Steel sheet pile engineering, road and bridge engineering construction, vibration compaction construction, rotary pile driver construction, sinking pipe cast-in-place pile foundation construction, concrete sheet pile construction, offshore pile construction, pile foundation construction in sensitive areas, etc.
- Permanent projects: wharf, water conservancy dike revetment, retaining wall, retaining wall, breakwater, diversion dike, dock, gate; offshore pile foundation construction, road and bridge engineering, civil construction, municipal engineering, water conservancy engineering, etc.
- Temporary projects: Mountain sealing, temporary bank expansion, cut-off, bridge and cofferdam construction, earth retaining, water retaining and sand retaining for excavation of temporary ditches for large-scale pipeline laying; it can also be used for flood control, collapse prevention and quicksand prevention.
Technical Parameter
Item | FV-150 | FV-250 | FV-280 | FV-300 | FV-330 | FV-350L | FV-350 | FV-400 |
Vibration Frequency (rpm) | 2500 | 2500 | 2800 | 3200 | 3200 | 3200 | 3200 | 3200 |
Operation Pressure (Mpa) | 30 | 32 | 32 | 32 | 32 | 32 | 32 | 32 |
Centrifugal Force (KN) | 172 | 265 | 335 | 350 | 372 | 435 | 455 | 485 |
Max.Pile Length (m) | 8 | 10 | 12 | 12 | 12 | 15 | 15 | 18 |
Arm Weight (kg) | 260 | 500 | 500 | 670 | 670 | 670 | 750 | 750 |
Hammer Weight (kg) | 1100 | 1700 | 1900 | 2100 | 2300 | 2400 | 2600 | 2700 |
Excavator (T) | 12~17 | 20-30 | 20-30 | 30-35 | 33-40 | 35-40 | 40-45 | 45-60 |
FAQ
Q: How long is the warranty period ?
A: The warranty period is 12 months from the date of completion of installation, the mainframe and key components, except for wearing parts.
Q: What is the MOQ ?
A: 1 set is available.
Q: What's the payment method ?
A: We accept T/T and D/P payment.
Q: What is the delivery time ?
A: The delivery time is generally 7-35 days, and arrive at Shanghai Port. Shipping time should be considered overseas.
Q: Can I have our LOGO on the machine ?
A: Of course you can.
Q: How is your product quality ?
A: Our equipment is strictly implemented in accordance with the technical standards of "Technical Conditions for Pile Driver Enterprises".
Q: Can I be your dealer ?
A: Welcome to become our dealer, and we are looking forward to further developing into a regional general agent and strategic partner like you with lofty ideals!