Yellow Color 15m Sheet Piling Driver 3200rpm Eco Friendly

Place of Origin Shanghai, China
Brand Name VIBRA
Certification ISO 9001:2015
Model Number FV-350
Minimum Order Quantity 1 set
Packaging Details 7.616 CBM
Delivery Time 15-35 days
Payment Terms T/T, D/P, Western Union, MoneyGram
Supply Ability 15 set/month

Contact me for free samples and coupons.

Whatsapp:0086 18588475571

Wechat: 0086 18588475571

Skype: sales10@aixton.com

If you have any concern, we provide 24-hour online help.

x
Product Details
Name Vibro Sheet Pile Hammer Feature Eco-friendly Pile Driver
Vibration 3200 Rpm Pressure 32 Mpa
Centrifugal Force 455 KN Arm 750 Kg
Hammer 2600 Kg Excavator 40-45 T
Material Steel, Core Materials Are All Imported Type New And Used Both Available
Color Yellow, Customized Color Available HS Code 84301000
High Light

15m Sheet Piling Driver

,

Yellow Color Sheet Piling Driver

,

Sheet Piling Driver 3200rpm

Leave a Message
Product Description

About Us
 
Ye Kun Construction Machinery Co., Ltd. is one specialized is engaged in the vibration sinking pile drawing machine equipment production, sale and service of technology-oriented enterprises, products mainly emerging a high-speed hydraulic pile drawing machine and peripheral accessories, equipment widely used in all kinds of foundation engineering construction.
 
After a short period of development, the company won the recognition of customers, and the annual sales growth doubled. Marketing the country with the VIBRA brand and export it. The company′s production of mini hydraulic pile driver, vibration hammer and other products quality has reached the advanced level of the industry.
 
The company has a young and enterprising team cooperation, in order to respect the customer value as self value, to become the most reliable, the most comprehensive, the most professional vibration pile machine equipment and service suppliers and make unremitting efforts.
Shanghai Ye Kun Construction Machinery Co., Ltd. is one specialized is engaged in the vibration sinking pile drawing machine equipment production, sale and service of technology-oriented enterprises, products mainly emerging a high-speed hydraulic pile drawing machine and peripheral accessories, equipment widely used in all kinds of foundation engineering construction.
 
 
Description
 
VIBRA vibrating pile hammer is utilizing its high frequency vibration to vibrate pile body with high-speed increase to pass the vertical vibration of mechanical produce to pile which prompting changes in the soil structure around the pile, strength decline. Soil around the piles become liquefaction to lessen frictional opposition between side of the pile and the soil. Then, at that point, utilizing the excavator down power, vibrating pile hammer and pile body weight to sink pile into the soil. When extricating piles, in the state of vibration to take out the pile by utilizing excavator lift power. Excitation power required by pile driving hardware are extensive controlled by site soil, soil condition, dampness content and sort of pile development.
 
Technical Parameter

 

Item FV-250 FV-280 FV-300 FV-330 FV-350L FV-350 FV-400
Vibration Frequency (rpm) 2500 2800 3200 3200 3200 3200 3200
Operation Pressure (Mpa) 30 32 32 32 32 32 32
Centrifugal Force (KN) 265 335 350 372 435 455 485
Max.Pile  (m) 10 12 12 12 15 15 18
Arm  (kg) 500 500 670 670 670 750 750
Hammer (kg) 1700 1900 2100 2300 2400 2600 2700
Excavator (T) 20-30 20-30 30-35 33-40 35-40 40-45 45-60

 
Yellow Color 15m Sheet Piling Driver 3200rpm Eco Friendly 0
 
 
Yellow Color 15m Sheet Piling Driver 3200rpm Eco Friendly 1
 
Yellow Color 15m Sheet Piling Driver 3200rpm Eco Friendly 2
 
Yellow Color 15m Sheet Piling Driver 3200rpm Eco Friendly 3
FAQ
 
Q: How long is the warranty period ?
 
A: The warranty period is 12 months from the date of completion of installation, the mainframe and key components, except for wearing parts.
 
Q: What is the MOQ ?
 
A: 1 set is available.
 
Q: What's the payment method ?
 
A: We accept T/T and D/P payment.
 
Q: What is the delivery time ?
 
A: The delivery time is generally 7-35 days, and arrive at Shanghai Port. Shipping time should be considered overseas.
 
Q: Can I have our LOGO on the machine ?
 
A: Of course you can.
 
Q: How is your product quality ?
 
A: Our equipment is strictly implemented in accordance with the technical standards of "Technical Conditions for Pile Driver Enterprises".
 
Q: Can I be your dealer ?
 
A: Welcome to become our dealer, and we are looking forward to further developing into a regional general agent and strategic partner like you with lofty ideals!
 
Q: How To Order?
 
A:
1. Please tell us the model with quantity and other requirement which you needed.
2. We issue the Proforma Invoice to you after confirmed the price and other details.
3. We arrange the order production upon receipt of confirmed PI and your deposit or original L/C.
4. After the goods is ready to ship, we will inform you the shipment date and other informations by email at the same time.
5. We will help to track your goods until you receive them safely.