Construction Bridge Engineering Excavator Concrete Pile Driving Equipment

Place of Origin SHANGHAI
Brand Name VIBRA
Model Number FV-150
Minimum Order Quantity 1 set
Price 16,000 to 23,000 USD
Packaging Details 4.5 CBM
Delivery Time 8-35 days
Payment Terms T/T, D/P, Western Union, MoneyGram
Supply Ability 20 set/month

Contact me for free samples and coupons.

Whatsapp:0086 18588475571

Wechat: 0086 18588475571

Skype: sales10@aixton.com

If you have any concern, we provide 24-hour online help.

x
Product Details
Name Hydraulic Vibrating Sheet Pile Driver Feature Mini Pile Driver Suitable For Small Excavator
Use Construction Work Related To Piling Brand VIBRA
Material Core Materials Are All Imported Color Blue/Yellow, Customized Color Available
Hammer Weight 1100 Kg Arm 260 Kg
Max Piling 8 Meter
High Light

excavator Concrete Pile Driving Equipment

,

Construction Concrete Pile Driving Equipment

,

bridge engineering pile driver

Leave a Message
Product Description

 

Description

 

Regardless of the application, our experienced team can help select the right pile driving equipment for your particular job.

 

Mini hydraulic pile driver for the company's original products, its birth to fill the industry gap; Changed the history of small excavator can not be refitted pile driver; Solve the problem that small foundation pile can not be mechanized construction.

This series of models for the new rural reconstruction of the basic engineering construction has made an outstanding contribution.

 

Features

  • Main application fields of hydraulic vibration hammer at present: Steel sheet pile engineering, road and bridge engineering construction, vibration compaction construction, rotary pile driver construction, sinking pipe cast-in-place pile foundation construction, concrete sheet pile construction, offshore pile construction, pile foundation construction in sensitive areas, etc.
  • Permanent projects: wharf, water conservancy dike revetment, retaining wall, retaining wall, breakwater, diversion dike, dock, gate; offshore pile foundation construction, road and bridge engineering, civil construction, municipal engineering, water conservancy engineering, etc.
  • Temporary projects: Mountain sealing, temporary bank expansion, cut-off, bridge and cofferdam construction, earth retaining, water retaining and sand retaining for excavation of temporary ditches for large-scale pipeline laying; it can also be used for flood control, collapse prevention and quicksand prevention.

 

Technical Parameter

 

Item FV-150 FV-250 FV-280 FV-300 FV-330 FV-350L FV-350 FV-400
Vibration Frequency (rpm) 2500 2500 2800 3200 3200 3200 3200 3200
Operation Pressure (Mpa) 30 32 32 32 32 32 32 32
Centrifugal Force (KN) 172 265 335 350 372 435 455 485
Max.Pile Length (m) 8 10 12 12 12 15 15 18
Arm Weight (kg) 260 500 500 670 670 670 750 750
Hammer Weight (kg) 1100 1700 1900 2100 2300 2400 2600 2700
Excavator (T) 12~17 20-30 20-30 30-35 33-40 35-40 40-45 45-60

 

Construction Bridge Engineering Excavator Concrete Pile Driving Equipment 0

 

FAQ

 

Q: How long is the warranty period ?

 

A: The warranty period is 12 months from the date of completion of installation, the mainframe and key components, except for wearing parts.

 

Q: What is the MOQ ?

 

A: 1 set is available.

 

Q: What's the payment method ?

 

A: We accept T/T and D/P payment.

 

Q: What is the delivery time ?

 

A: The delivery time is generally 7-35 days, and arrive at Shanghai Port. Shipping time should be considered overseas.

 

Q: Can I have our LOGO on the machine ?

 

A: Of course you can.

 

Q: How is your product quality ?

 

A: Our equipment is strictly implemented in accordance with the technical standards of "Technical Conditions for Pile Driver Enterprises".

 

Q: Can I be your dealer ?

 

A: Welcome to become our dealer, and we are looking forward to further developing into a regional general agent and strategic partner like you with lofty ideals!