Lightweight Hydraulic Vibratory Hammer For Sheet Pile Driving

Place of Origin SHANGHAI
Brand Name VIBRA
Model Number FV-300
Minimum Order Quantity 1 set
Price 23000 to 28000 USD
Packaging Details 5.824 CBM
Delivery Time 7-35 days
Payment Terms L/C, T/T, D/P
Supply Ability 15 Set/Month

Contact me for free samples and coupons.

Whatsapp:0086 18588475571

Wechat: 0086 18588475571

Skype: sales10@aixton.com

If you have any concern, we provide 24-hour online help.

x
Product Details
Name Hydraulic Vibrating Pile Driver Feature Flexible Control System
Pressure 32 Mpa Arm 670 Kg
Hammer 2100 Kg Vibration 3200 Rpm
Centrifugal Force 350 Kn Excavator 30-35 Ton
Max. Pile 12 Meter Color Blue, Customized Color Available
High Light

lightweight hydraulic vibratory hammer

,

lightweight vibratory pile driving equipment

,

hydraulic vibratory pile driving equipment

Leave a Message
Product Description

Low Noise Hydraulic Pile Driver Applied To Various Working Environments

 

Advantages

 

- Easy to operate

 

- Flexible control system

 

- Silence operation good for environment

 

 -Easy maintenance increase lifetime

 

- Precision design makes it suitable for use in remote places

 

- Reliable performance with quality works

 

- Quick speed, accurate pile driving

 

- Save time and Ensure High Efficency 

 

Lightweight Hydraulic Vibratory Hammer For Sheet Pile Driving 0

 

Features

  • Pile driving steel sheet pile, cement pile, steel rail pile, iron plate, H steel
  • Applied to various working environments,  Quick converting operation
  • Less force required for pile pulling, c ompared to other systems
  • No damage in the top or bottom of steel pipe pile, steel plate pile and steel rail pile.
  • No damage in the building even often work near it.
  • Built in Rubber sheath to reduce noise and vibration, the operation is quiet and the working period is short; It is helpful to overcome environmental problems.
  • Sheet pile can be clamped or lowered by positive and negative rotation of 180 °. The vibration frequency can be adjusted by two levels, and the two-level double pumps are combined to greatly increase the excitation force.
  • Hydraulic motor has small volume and light weight at the same time it can output high power and high speed.
  • Vibration frequency can be adjusted by variable pump. It can be used in excavator operation of any brand, and can meet different work requirements.

Lightweight Hydraulic Vibratory Hammer For Sheet Pile Driving 1

 

Technical Parameter

 

Item FV-250 FV-280 FV-300 FV-330 FV-350L FV-350 FV-400
Vibration Frequency (rpm) 2500 2800 3200 3200 3200 3200 3200
Operation Pressure (Mpa) 30 32 32 32 32 32 32
Centrifugal Force (KN) 265 335 350 372 435 455 485
Max.Pile (m) 10 12 12 12 15 15 18
Arm (kg) 500 500 670 670 670 750 750
Hammer (kg) 1700 1900 2100 2300 2400 2600 2700
Excavator (T) 20-30 20-30 30-35 33-40 35-40 40-45 45-60

 

About Us

 

Shanghai Yekun Construction Machinery Co., Ltd. was founded in 2014 A professional company involving in hydraulic vibrating pile driver manufacture, sale and service. Our company take the latest high speed hydraulic vibrating pile driver and its components as the main products. Our products vastly apply for infrastructure & construction industries.

 

We focus on product quality with the latest industrial technology. The mini hydraulic vibrating pile driver lead the industrial trend. The middle and large hydraulic vibrating pile driver also are highly recognized by our clients. At the same time, we actively cooperated with the engineering machinery factory and construction company to jointly develop more functional professional equipment, and we hired foreign professionals as our technical adviser.

 

 

Lightweight Hydraulic Vibratory Hammer For Sheet Pile Driving 2

 

FAQ

 

Q: How long is the warranty period?

 

A: 12 months from the date of completion of installation, the mainframe and key components, except for wearing parts.

 

Q: What is the MOQ?

 

A: 1 set is available.

 

Q: What's the payment method?

 

A: We accept L/C, T/T and D/P payment.

 

Q: What is the delivery time?

 

A: The delivery time is generally 7-35 days, and arrive at Shanghai Port. Shipping time should be considered overseas.

 

Q: Can I have our LOGO on the machine?

 

A: Of course you can, please let us know before manufacturing.

 

Q: How is your product quality?

 

A: Our equipment is strictly implemented in accordance with the technical standards of "Technical Conditions for Pile Driver Enterprises".

 

Q: Can I be your dealer?

 

A: Welcome to become our dealer, and we are looking forward to further developing into a regional general agent and strategic partner like you with lofty ideals!