Shanghai Yekun Construction Machinery Co., Ltd.

Vibratory Hammer & Service Suppiler

Home ProductsHydraulic Pile Driver

Quick Converting Hydraulic Pile Driver , Sheet Pile Machine For 17 Ton Excavator

Certification
China Shanghai Yekun Construction Machinery Co., Ltd. certification
China Shanghai Yekun Construction Machinery Co., Ltd. certification
I'm Online Chat Now

Quick Converting Hydraulic Pile Driver , Sheet Pile Machine For 17 Ton Excavator

Quick Converting Hydraulic Pile Driver , Sheet Pile Machine For 17 Ton Excavator
Quick Converting Hydraulic Pile Driver , Sheet Pile Machine For 17 Ton Excavator

Large Image :  Quick Converting Hydraulic Pile Driver , Sheet Pile Machine For 17 Ton Excavator

Product Details:
Place of Origin: SHANGHAI
Brand Name: VIBRA
Model Number: FV-150
Payment & Shipping Terms:
Minimum Order Quantity: 1 set
Price: 15000 to 25000 USD
Packaging Details: 4 CBM
Delivery Time: 7-35 days
Payment Terms: L/C, T/T, D/P
Supply Ability: 15 Set/Month
Detailed Product Description
Name: Hydraulic Pile Driving Equipment Feature: ISO 9001:2015 Certified
Operation Pressure: 30 Mpa Arm Weight: 260 Kg
Hammer Weight: 1100 Kg Vibration Frequency: 2500 Rpm
Centrifugal Force: 172 Kn Excavator: 12~17 Ton
HS Code: 8430100000 Color: Blue/Yellow, Customized Color Available
Max Piling Depth: 14m For Soft Soil, 8m For Normal Soil
High Light:

quick converting Hydraulic Pile Driver

,

17 Ton sheet pile machine

,

quick converting sheet pile machine

Mini Excavator Mounted Hydraulic Pile Driver

 

Mini hydraulic pile driver for the company's original products, its birth to fill the industry gap; Changed the history of small excavator can not be refitted pile driver; Solve the problem that small foundation pile can not be mechanized construction.

This series of models for the new rural reconstruction of the basic engineering construction has made an outstanding contribution.

 

Equipment advantages:

The structure is ultra-small and lightweight, and the vibration force is maximized.

Upgraded to the fourth generation model, more reasonable mechanical structure, high stability of the machine;

It can be used in the construction of narrow river course and house foundation, and can be used for drawing steel sheet piles, cement piles, wooden piles, etc.

 

Quick Converting Hydraulic Pile Driver , Sheet Pile Machine For 17 Ton Excavator 0

 

Quick Converting Hydraulic Pile Driver , Sheet Pile Machine For 17 Ton Excavator 1

 

Quick Converting Hydraulic Pile Driver , Sheet Pile Machine For 17 Ton Excavator 2

 

Technical Parameter

 

Item FV-150 FV-250 FV-280 FV-300 FV-330
Vibration Frequency (rpm) 2500 2500 2800 3200 3200
Operation Pressure (Mpa) 30 30 32 32 32
Centrifugal Force (KN) 172 265 335 350 372
Max.Pile Length (m) 8 10 12 12 12
Arm Weight (kg) 260 500 500 670 670
Hammer Weight (kg) 1100 1700 1900 2100 2300
Excavator (T) 12~17 20-30 20-30 30-35 33-40

 

 

About Us

 

Shanghai Ye Kun Construction Machinery Co., Ltd. is one specialized is engaged in the vibration sinking pile drawing machine equipment production, sale and service of technology-oriented enterprises, products mainly emerging a high-speed hydraulic pile drawing machine and peripheral accessories, equipment widely used in all kinds of foundation engineering construction.

 

After a short period of development, the company won the recognition of customers, and the annual sales growth doubled. Marketing the country with the VIBRA brand and export it. The company′s production of mini hydraulic pile driver, vibration hammer and other products quality has reached the advanced level of the industry.

 

Our company is consisting of a young, enthusiasm professional team. Adhere to client as priority, Quality as first concern, Management as foundation. We are working for the direction to become the most professional and comprehensive hydraulic vibrating pile driver manufacture and service supplier.

 

Quick Converting Hydraulic Pile Driver , Sheet Pile Machine For 17 Ton Excavator 3

FAQ

 

Q: How long is the warranty period ?

 

A: The warranty period is 12 months from the date of completion of installation, the mainframe and key components, except for wearing parts.

 

Q: What is the MOQ ?

 

A: 1 set is available.

 

Q: What's the payment method?

 

A: We accept T/T and D/P payment.

 

Q: What is the delivery time?

 

A: The delivery time is generally 7-35 days, and arrive at Shanghai Port. Shipping time should be considered overseas.

 

Q: Can I have our LOGO on the machine?

 

A: Of course you can.

 

Q: How is your product quality?

 

A: Our production unit is ISO 9001:2015 certified. Our equipment is strictly implemented in accordance with the technical standards of "Technical Conditions for Pile Driver Enterprises".

Contact Details
Shanghai Yekun Construction Machinery Co., Ltd.

Contact Person: Sales Manager

Send your inquiry directly to us (0 / 3000)